Build it right the first time
Most failed mushroom farms were lost at the design stage, not the growing stage.
Who this is for
For entrepreneurs building a farm and operators fixing an underperforming one.
What we offer
Feasibility & planning
Assess the site, the market and the numbers before capital is committed.
Infrastructure design
Grow room layout, insulation, airflow and climate system specification.
Process setup
Substrate lines, sterilisation, spawning and harvest workflow.
Troubleshooting
Diagnose contamination, weak flushes and yield problems on running farms.
How it works
- 1
Assessment
Understand your site, budget, target crop and market.
- 2
Design
Produce the layout, equipment specification and process plan.
- 3
Implementation support
Guidance through build-out and commissioning.
- 4
Review
Post-commissioning review against the plan, with corrections.
Common questions
Do you consult on existing farms?
Yes. A large part of the work is diagnosing farms that are running but underperforming.
Do you supply the equipment too?
Tell us your requirement and we will confirm what we can supply directly and what we specify.
Tell us what you need
Share a few details and the right person will get back to you.
